1. Edo Refinery
Relevant Industry: Modular Refinery
Owner: Edo Refinery and Petrochemical Co.
Country: Nigeria
Project Overview:
Capacity: Phase one 1,000BPD, Phase two 5,000BPD
Role: EPC+OM+F
Product: Maximum Diesel yield 67%, average 55%, crude design by API 35, but various crude. The refined products sold are Diesel, Naphtha and Low Pour Fuel Oil (LPFO).
Scope: Fabrication of multiple storage tanks, piping systems, and ancillary equipment.
Land and Location: 5.6 Hectare, Ologbo Edo state, Nigeria
Financing Mode: Equity 49%
Commence Date: Sep 2018
Commissioning Date: Jun 2020
Project Images:
2. Koko Refinery
Relevant Industry: Modular Refinery
Owner: AIPCC Energy Co.
Country: Nigeria
Project Overview:
Construction of our fully owned and operated refinery located on the Benin River in Koko, Delta State has commenced.
The refinery has two phases, in the phase 1 Naphtha, Diesel, Low Pour Fuel Oil, LPG, Propane & Paint Solvent will be produced, with revenues exceeding 2.0 billion USD annually. The OSBL and jetty have been completed, with an estimated full project completion and commissioning date of June 2025.
Phase 2 will increase refining capacity, with revenues exceeding 5.0 billion USD annually, and will commence immediately upon Phase 1 completion. In addition to Phase 1 product slate, Phase 2 will produce: Sulfur, Sulfuric Acid, Vacuum Gas Oil, Base Oil and Bitumen.
Capacity: Phase one 3,000BPD, Phase two 30,000BPD
Role: EPC+OM
Land and Location: 37 Hectare, Koko Delta State, Nigeria
Commence Date: Feb 2024
Commissioning Date: Jun 2025 (Not complete)
Project Images:
Patented Internal & Packing:
PCC developed many new and efficient packing to meet the different medium and usage environment based on the original packing. Winpak packing, this packing can greatly improve gas-liquid flux, under the same amount of treatment, by using the Winpak packing can effectively reduce the tower diameter and energy consumption. PCC also developed special reaction packing for reactive distillation. The catalyst is put in the packing, which can greatly improve the device efficiency by reacting & separating at the same time.
_1735808192_WNo_1190d793.jpg)
Patented Trays & Distributors
PCC is also widely used the Tianjin University patented guided trapezoid valve tray, and all kinds of patented distributors.

1. Oil-water Batch Distillation Plant
Relevant Industry: Oil-water separation intermittent distillation unit
Owner: CHEM-SPECIALTIES SDN. BHD.
Country: Malaysia
Project Overview:
The owner is a company that cooperates with Petronas and specializes in solvent recovery, chemical refining, and chemical wastewater treatment. The owner requires us to design and manufacture modular skid-mounted units for easy and fast installation and construction. The COD of wastewater containing oil falls from 4000 PPM to below 200 PPM. After our experiments and process simulation, the device can handle the COD below 100 PPM.
We adopt modular overall design and construction solutions for fast installation and construction. All indicators meet the design requirements.
Role: ASME Standard EPC Turn-key
Land and Location: Kuala Lumpur, Malaysia
Commissioning Date: In 2015 (Completed)
Project Images:
1. LPG Gas Processing Plant
Relevant Industry: Gas Processing Plant
Owner: Green Energy E&P Co.
Country: Nigeria
Project Overview:
Capacity: Phase one 12MMSCFD, Phase two 25MMSCFD
Role: EP
Land and Location: 4 Hectare, Otakipo River State, Nigeria
Commence Date: Mar 2017
Commissioning Date: Sep 2024
Project Images:
1. FMGSL Gas Processing Plant
Relevant Industry: Torch Gas Recovery to Produce LPG and CNG
Owner: First Modular Gas Service Co.
Country: Nigeria
Project Overview:
Capacity: Phase one 5MMSCFD, Phase two 15MMSCFD
Role: EPC+OM+F
Land and Location: 1 Hectare, Abia State, Nigeria
Commence Date: Nov 2023
Commissioning Date: Jul 2025 (Not complete)
Project Images:
2. Topline LNG Plant
Relevant Industry: Flare Gas Recovery to LNG
Owner: Topline Energy Co.
Country: Nigeria
Project Overview:
Capacity: Phase one 5MMSCFD, Phase two 25MMSCFD
Role: EP+OM+F
Land and Location: 4 Hectare, Otakipo River State, Nigeria
Financing Mode: EPC+Dept
Commence Date: Mar 2023
Commissioning Date: Jul 2024 (Not complete)
Project Images: